How Much Soil Do I Need for a Raised Garden Bed?
Soil volume and bag counts for common raised bed sizes, round beds and deep beds, plus how to fill a tall bed without buying soil for the whole depth.
The formula
A rectangular raised bed holds length × width × depth. Work in feet to get cubic feet, and divide by 27 for cubic yards. A 4 by 8 foot bed filled 12 inches deep holds 4 × 8 × 1 = 32 cubic feet, or 1.19 cubic yards.
Soil for common bed sizes
| Bed size | Fill depth | Cubic feet | Cubic yards | 1 ft³ bags | 1.5 ft³ bags |
|---|---|---|---|---|---|
| 2 × 4 ft | 12 in | 8 | 0.30 | 8 | 6 |
| 3 × 6 ft | 12 in | 18 | 0.67 | 18 | 12 |
| 4 × 4 ft | 12 in | 16 | 0.59 | 16 | 11 |
| 4 × 8 ft | 12 in | 32 | 1.19 | 32 | 22 |
| 4 × 8 ft | 18 in | 48 | 1.78 | 48 | 32 |
| 4 × 12 ft | 12 in | 48 | 1.78 | 48 | 32 |
These figures are before any allowance. Fresh soil and compost settle after watering, so many gardeners add about 10 percent or plan to top up after the first few weeks. The topsoil calculator adds the allowance and works out bags for any bag size.
Round and stock-tank beds
For a round bed, the volume is π × radius² × depth. A 4 foot diameter bed filled 18 inches deep holds 3.1416 × 2² × 1.5 = 18.85 cubic feet, or 0.70 cubic yards. Measure the inside diameter, since the walls take up space.
How deep to fill
Many vegetables do well with 8 to 12 inches of good soil, and deep-rooted crops like more. If the bed sits on loosened ground, roots can grow down into the soil below, so the bed itself does not have to hold the full root depth. Beds on patios or hard ground need the full depth inside the bed.
Filling a tall bed for less
Tall beds, such as 24 to 30 inch waist-high beds, hold a lot of soil: a 4 by 8 foot bed filled 24 inches deep holds 64 cubic feet, or 2.37 cubic yards. Some gardeners fill the bottom part with coarse organic material such as logs, branches or leaves, then put soil on top. The organic layer breaks down over time, so expect the surface to sink and plan to top up each season. If you do this, calculate soil only for the depth you will fill with soil.
What to fill with
Raised bed mixes are usually a blend of topsoil and compost, sometimes with other ingredients for drainage. Bagged "raised bed soil" is ready to use but costs more per cubic foot than bulk. For several beds, a bulk blend from a landscape supplier is often more economical. Your local extension service can suggest a mix for your area.
Bags or bulk?
One cubic yard is 27 cubic feet, which is 27 bags of 1 cubic foot or 18 bags of 1.5 cubic feet. Two 4 by 8 foot beds at 12 inches need 64 cubic feet, about 2.4 cubic yards. Once you need more than one or two cubic yards, compare the bulk price including delivery with the bag price per cubic foot.
Building the bed: lumber and soil together
A 4 by 8 foot bed built from 2×6 boards stacked two high is 11 inches deep, since each 2×6 is 5.5 inches wide. The frame needs two 8 foot boards for each long side and two 4 foot pieces for each end, which is 48 linear feet, or six 8 foot boards. A 2×6 has 1 board foot per linear foot, so the frame is 48 board feet. The board foot calculator helps if your lumber is priced that way.
Filled to the top, the bed holds 4 × 8 × 11/12 = 29.33 cubic feet of soil, about 1.09 cubic yards. Many gardeners fill to an inch or two below the top so soil does not wash over the edge.
Mixing your own blend
Gardeners who mix their own soil often combine topsoil with compost and sometimes a coarse material for drainage. The volume math works the same way for each ingredient: decide the share of each and multiply the total volume. For a 32 cubic foot bed split 60 percent topsoil and 40 percent compost, that is 19.2 cubic feet of topsoil and 12.8 cubic feet of compost. Mix the ingredients before filling, or layer and mix them in the bed. Your local extension service can suggest a blend for your area and crops.
Several beds and the paths between them
A garden of three 4 by 8 foot beds at 12 inches deep needs 96 cubic feet of soil, or 3.56 cubic yards. If the beds sit in a row with 2 foot paths between them and around them, the path area is often finished with mulch or gravel. Measure the whole garden, subtract the bed areas and use the mulch calculator for the paths.
Refilling an existing bed
Soil in raised beds settles and breaks down over a season or two. To top up, measure the gap between the soil surface and the level you want and use that as the depth. A 4 by 8 foot bed that has sunk 2 inches needs 4 × 8 × 2/12 = 5.33 cubic feet, about four bags of 1.5 cubic feet. Mixing in compost each season helps keep the soil in good condition.
Common mistakes
- Measuring the outside of the bed instead of the inside, which overestimates soil.
- Filling with heavy, clay-rich soil alone, which can compact and drain poorly.
- Forgetting that new soil settles and leaving no allowance.
- Mixing up cubic feet on bags with cubic yards in bulk prices.
Frequently asked questions
How many bags of soil for a 4 by 8 raised bed?
At 12 inches deep, 32 cubic feet: 32 bags of 1 cubic foot or 22 bags of 1.5 cubic feet, plus about 10 percent for settling.
Should I put landscape fabric at the bottom?
Some gardeners use cardboard to smother grass under a new bed; it breaks down over time. Fabric can limit root growth and worm activity. Hardware cloth is used where burrowing animals are a problem.
How often do I need to add soil?
Many gardeners top up with an inch or two of compost each season as the soil settles and breaks down.
Try a related calculator
Run the numbers for your own project with the matching CostRafter calculator.
Related guides
More published planning articles in the same topic.
CostRafter Guide
Landscaping
Landscaping
Retaining Wall Block Sizes: How Many Blocks per Foot?
Blocks per linear foot, per course and per square foot for common retaining wall block sizes, with worked examples and handling tips.
CostRafter Guide
Landscaping
Landscaping
Paver Patterns: How Much Extra Should You Buy?
Running bond, basketweave, herringbone and circles each waste a different amount. Plan the right allowance and count border pavers separately.
CostRafter Guide
Landscaping
Landscaping
How Many Retaining Wall Blocks Do I Need?
Count courses and blocks from wall length, height and block size, include buried courses and caps, and plan the base and drainage gravel.
More in Landscaping
See the published calculators and guides collected under this topic.
Open Landscaping topic →