How Much Concrete Do I Need for a Fence Post?

Size the hole, subtract the post, add a waste allowance and convert the volume into bags, with tables for common post holes and deck footings.

By , Lead Calculator Analyst

The short answer

A typical fence post hole, 10 inches across and 3 feet deep with a 4×4 post, holds about 1.38 cubic feet of concrete. That is between 2 and 3 bags of an 80 lb mix that yields about 0.60 cubic feet per bag. The exact amount depends on your hole, so the rest of this guide shows how to work it out.

Step 1: size the hole

A common rule of thumb is a hole about three times the width of the post. A 4×4 post (3.5 inches actual) points to a hole of about 10 to 12 inches. Depth depends on post height, soil and frost. Many builders bury a third to a half of the above-ground height and, in cold climates, go below the frost line. Local rules may set the minimum.

Step 2: calculate the hole volume

For a round hole the volume is π × radius² × depth. Work in feet to get cubic feet:

  • A 10 inch hole has a radius of 5 inches, or 0.4167 feet.
  • π × 0.4167² = 0.5454 square feet.
  • At 3 feet deep, 0.5454 × 3 = 1.6362 cubic feet.

Step 3: subtract the post

The post takes up part of the hole. A 4×4 is 3.5 by 3.5 inches, or 0.0851 square feet, so over 3 feet it displaces 0.2552 cubic feet. That leaves 1.381 cubic feet of concrete per hole. If the post sits on a few inches of gravel, the displacement is slightly smaller.

Step 4: multiply and add an allowance

Holes dug by hand or auger are rarely perfect cylinders. They flare at the top and wander at the bottom. A 10 percent allowance is a sensible start. Ten holes come to 13.81 cubic feet, or 15.19 cubic feet with the allowance.

Step 5: convert to bags

Read the yield on the bag. Many 80 lb bags of concrete mix list about 0.60 cubic feet, 60 lb bags about 0.45 and 40 lb bags about 0.30, but products differ. Divide the total by the yield and round up: 15.19 ÷ 0.60 = 25.3, so 26 bags.

Quick table for common holes

HolePostConcrete per hole
8 in × 24 in4×40.53 ft³
10 in × 36 in4×41.38 ft³
12 in × 36 in4×42.10 ft³
12 in × 42 in6×62.01 ft³

For a 6×6 post, use 5.5 inches as the post size. Values above are before any waste allowance.

Deck footings and tube forms

Deck piers are often poured in round cardboard tube forms, such as 8, 10 or 12 inch diameters. The math is the same without the post. Eight 12 inch tubes, 4 feet deep, hold 25.13 cubic feet, or 27.65 cubic feet with 10 percent extra. That is 47 bags at 0.60 cubic feet, or about one cubic yard of ready-mix. Deck footing size and depth are set by your plans and local code, often with a wider base below the tube.

Dry-set or mixed?

Some fast-setting post mixes are poured dry into the hole and then soaked with water. The volume calculation is the same, but follow the product directions for water and setting time, and use the yield on that product.

Worked example: a whole fence

A 100 foot fence with posts 8 feet apart and one gate has 14 posts. Each 4×4 post sits in a 10 inch hole, 30 inches deep, on 4 inches of gravel, so the concrete fills 26 inches of the hole.

  • Hole volume over 26 inches: π × 0.4167² × 2.1667 = 1.1817 ft³.
  • Post displacement over 26 inches: 0.0851 × 2.1667 = 0.1843 ft³.
  • Concrete per hole: 0.9974 ft³. For 14 posts: 13.96 ft³, or 15.36 ft³ with 10 percent extra.
  • At 0.60 ft³ per bag: 25.6, so 26 bags.

In the footing calculator, enter the depth of concrete (26 inches), not the depth of the hole, when there is gravel underneath.

Gravel under the post

Many builders put a few inches of gravel in the bottom of each hole so water can drain away from the end of a wood post. The gravel is a separate material: for a 10 inch hole, 4 inches of gravel is π × 0.4167² × 0.333 = 0.18 ft³ per hole, so 14 holes need about 2.5 ft³, roughly two or three bags of gravel.

Mixing tips for post holes

  • Mix one or two bags at a time in a wheelbarrow, or use a mixing tub for small batches.
  • Use the water amount on the bag; extra water makes weaker concrete.
  • Brace each post plumb before pouring and check it again after the concrete is in.
  • Slope the top of the concrete away from the post so water runs off.
  • Let the concrete cure as the bag directs before hanging rails or gates.

Deck footings are different

Deck footings carry building loads and are usually covered by code. Their size depends on the load, the soil and the spacing of posts and beams, and they often have a wider base than the tube above it. Treat the volumes here as a way to buy the right amount of concrete for a footing that your plans or building department have already sized.

Bag sizes compared

BagTypical yield on the labelBags per cubic footBags per cubic yard
40 lbabout 0.30 ft³3.3390
60 lbabout 0.45 ft³2.2260
80 lbabout 0.60 ft³1.6745

Always use the yield printed on the product you buy; mixes differ, and fast-setting post mixes often have their own yields.

Common mistakes

  • Calculating with the diameter instead of the radius, which quadruples the volume.
  • Mixing inches and feet in the same formula.
  • Assuming bag weight equals yield.
  • Forgetting that bell-shaped or wide holes hold much more than a straight cylinder.

The concrete footing and post hole calculator runs these steps for round or rectangular holes and any number of posts.

Frequently asked questions

Should fence posts be set in concrete or gravel?

Both methods are common. Concrete gives a rigid base; compacted gravel drains better around wood posts. Many builders crown the concrete at the top so water runs away from the post.

How long before I can attach rails?

It depends on the mix and the weather. Fast-setting mixes may allow light work within hours, while standard mixes need longer. Follow the bag instructions.

Try a related calculator

Run the numbers for your own project with the matching CostRafter calculator.

Related guides

More published planning articles in the same topic.

More in Concrete & Masonry

See the published calculators and guides collected under this topic.

Open Concrete & Masonry topic →